Bekok-C Process-Power MOPU
Location: Indonesia
Fast track project (engineering to first gas) within 6 months utilizing second hand equipments/rig to replace Bekok-C CPP with a MOPU (Combined capacity of 165MMscfd and 4000bpd liquids) which comprises of;
- • Gas-Liquid Separation and slugcatcher
- • TEG Dehydration
- • Two stage compression
- • Full on-board power generation
- • Complete independent utilities
- • Integration to Bekok-C platform
- • Power supply to existing Bekok-C Complex and platforms
.
Synergy's Scope of Work
- • Topside Engineering
- • Hull Engineering
- • Field support
- • Operation support (manuals/procedures)
Key Project Achievements
- Complete Piping/E&I deliverables generated from master PDMS model
- Meet project engineering schedule.
- Fit for purpose design meeting safety, international standards, and Petronas Technical Standards (PTS)