Synergy Engineering is an energy services company based in Southeast Asia.
Client: Withheld
Location: Indonesia
Lengo field is located approximately 60km offshore Tuban, East Java at a water depth of 60m. The field was discovered in 2008 and has up to 100 MMscfd of gas production capacity.
The Client is developing the Lengo field with a minimum facilities wellhead platform connected to an Onshore Receiving and Processing Facility (ORF) via a 65km pipeline.
Synergy's Scope of Work
Synergy conducted the Reliability, Availability and Maintenance (RAM) Study for the field development, covering the production and utility systems identified as essential for production availability of the Lengo facilities.
The RAM study was performed considering different operating modes of the Topside and subsea equipment throughout the Lengo facilities operating life, based on the predicted production profile and operating requirements.